Showing posts with label summertime tunic. Show all posts
Showing posts with label summertime tunic. Show all posts

27.8.07

As the Seasons Change

I've finished the summer time tunic. The ribbon I had bought for it ended up being too short by a long shot, and I had to go buy more. I like the new ribbon much better anyway. I don't know what I'll use the other ribbon for, I'm sure I'll find something eventually.
I started the short row hat by Veronik Avery, and I love it. I had a few false starts ( I was tired and not reading the directions properly) last night, but I've been working on it all day at work and I hope to finish it tonight. I'm using Patons SWS, which is 70% wool and the rest soy. It has an interesting texture to it. The color repeats may be slightly longer than those in the original hat in the photograph, but its close, the pseudo-entrelac really shows off the color gradation quite nicely.
MS3 remains unfinished for now. I don't have any space with the packing up to work on it.
I'm desperately avoiding working on the damned Christmas stockings, and I really need to start, the clock is ticking faster and faster. I can tell already I"ll never be able to knit based on sale of completed items, at least not if other people dictate to me what I must knit. I need to get my ass moving on the designing thing.

25.8.07

Slacker!

I've been totally slacking on this blogging thing. I got back from vacation (where it rained a lot, we got 3 out of 5 beach days, two of which were overcast) and realized that I had just under two weeks to pack up everything I own and move out. Since I need my dad and his truck, and these two weeks are the two busiest weeks of the year for him at work, matters have become complicated. I have a lot of boxes sitting in my room right now, and lots more to pack.
I ended up taking the MS3 home with me, I worked on it a little, then had to put it on a waste string because I needed the needle for my summer tunic project. I ended up taking the socks and hat projects, as well, but left the MS3 at home. Mindless knitting is definitely the way to go at the beach. The 1x1 rib took forever, but once I got past things started moving more quickly. I'm nearly done, I'm working on the final inch of the back, then I need to complete the front few inches and I'm done. I have some lovely ribbons I picked out at Michael's for a dollar each, I'll have to decide which goes best.

14.8.07

Vacation Knitting

I'm going on vacation starting Thursday, and I 've started a new project to take along to the beach with me. I can't work on the MS3 because I need a flat surface to lay out the chart and the beach will seriously interfere with my knitting. So I've decided to keep it simple and work on some mindless knitting that I won't need to look at a pattern much for and won't have to worry about sand and such. I ordered Camilla from elann.com and have the first 3 inches or so of the Summertime Tunic from Interweave started. I have the pattern printed out and put in a plastic sheath (the ones that snap into your binders) so it won't get wet. The name is perfect and it's super super simple. I'm taking the MS3 with me to the campsite, I think I can work on it there. And when it comes time to do the 1x1 ribbing on the tunic, I'll need the size 4 needles from the MS3 to do it. I've already put some waste yarn in my bag so I don't forget ;)
I've also got the Short Row Hat from interweave all set up to go too, but I don't know if I'm taking it with me or not. the Soy/Wool blend will be too warm to work with during the day, but may be OK for the evening when its too dark to work on the MS3.

Is it just me or am I way over thinking this????